Chief Engineer LV Switchboards and Distribution Busway

AI infrastructure company that builds and operates large-scale compute and data-center infrastructure for frontier AI workloads.

New York City, United States
About Fluidstack

Fluidstack deploys AI compute infrastructure, including custom data centers and large-scale compute capacity, for AI labs, governments, and enterprises.

View jobs by Fluidstack

Skills

Candidate Availability

Required and preferred rules are kept separate and reflect the wording in the original posting.

About the Role

You will lead the clean-sheet design and production release of low-voltage switchboard and distribution busway platforms. You will manage engineering, testing, certification, localization, and vendor delivery activities.

Requirements

  • Experience designing low-voltage switchboards or busway at an OEM
  • Experience carrying a product through UL 891 or UL 857 listing
  • Experience running short-circuit withstand and temperature-rise test campaigns
  • Knowledge of bus, bracing, joint, plating, sheet metal, torque specifications, and assembly sequences
  • Experience leading a product team through a compressed release schedule
  • Ability to write ratings documentation and configuration rules

Responsibilities

  • Own clean-sheet design of UL 891 low-voltage switchboard and UL 857 distribution busway platforms
  • Release both platforms for production within 12 months
  • Lead electrical and mechanical engineers
  • Drive NRTL listing programs, test plans, witness testing, and certification files
  • Define localization requirements, including interconnects, protection interfaces, transport limits, and seismic anchorage
  • Work with authorized vendors to deliver consistent products

Benefits

  • Equity
Chief Engineer LV Switchboards and Distribution Busway at Fluidstack | JobStash