BESS Lead Engineer Power Generation
FluidstackVisit Fluidstack website
AI infrastructure company that builds and operates large-scale compute and data-center infrastructure for frontier AI workloads.
New York City, United States
Funding history
About Fluidstack
Fluidstack deploys AI compute infrastructure, including custom data centers and large-scale compute capacity, for AI labs, governments, and enterprises.
Skills
Candidate Availability
Required and preferred rules are kept separate and reflect the wording in the original posting.
About the Role
You will own the electrical design and sizing of large storage plants across concurrent sites. You will qualify BESS vendors, define hybrid-plant dispatch, lead safety compliance and hazard mitigation approvals, and take plants through commissioning, performance testing, and controls integration.
Requirements
- Experience taking grid-scale battery storage from single line to energized plant
- Experience sizing storage systems against real duty cycles and augmentation needs
- Experience selecting BESS vendors and conducting factory witness testing
- Experience obtaining NFPA 855 and hazard mitigation approvals
- Experience integrating storage controls with generation and load
- Clear technical writing
- NFPA 855
- hazard mitigation analysis
Responsibilities
- Own electrical design and sizing for multi-hundred-megawatt storage plants
- Qualify and dual-source BESS vendors
- Run factory witness testing, failure-mode reviews, and warranty evaluations
- Define integrated storage, solar, and on-site generation dispatch
- Drive NFPA 855 compliance and hazard mitigation approvals
- Lead commissioning, capacity testing, performance testing, and controls integration
